tel
Wechat:
Aerososcar
tel
Tel:
+86-18123521651
中文版

MENU

/
/
/
Meringue production line needs to install the equipment

Meringue production line needs to install the equipment

【概要描述】The Meringue production line resistance measurement method is often used to check whether the line is connected or not, whether there is a short circuit between two points

Meringue production line needs to install the equipment

【概要描述】The Meringue production line resistance measurement method is often used to check whether the line is connected or not, whether there is a short circuit between two points

Detail

The Meringue production line resistance measurement method is often used to check whether the line is connected or not, whether there is a short circuit between two points, whether the circuit board is shorted to the ground, and is also commonly used as a check when it is impossible to judge whether the components in the circuit are damaged. The simple method of components, in the test, the Meringue production line can not be found to be different when using the voltage measurement method. The cause of the fault is the short circuit of the resistance.

Meringue production line

When the emitter-base of the transistor is still short-circuited, one end of the resistor can be soldered off the circuit board, and the hot air is circulated for 3D baking. The imported original parts are used for precise temperature control, and the inner chamber of the furnace is made of aluminum silicate glass fiber insulation cotton for heat preservation. Well, when the emitter-base of the transistor is still short-circuited, one end of the resistor can be soldered off from the circuit board, and then measure the resistance value of the resistor, and then measure the resistance value of the resistor.

关键词:

Previous: None
Next: None
Previous: None
Next: None

More News

The reason why the yogurt in the Yogurt production line is not fermented
The reason why the yogurt in the Yogurt production line is not fermented
Sometimes in the Yogurt production line, yogurt does not ferment.
Detail
Sometimes in the Yogurt production line, yogurt does not ferment.
Meringue production line needs to install the equipment
Meringue production line needs to install the equipment
The Meringue production line resistance measurement method is often used to check whether the line is connected or not, whether there is a short circuit between two points
Detail
The Meringue production line resistance measurement method is often used to check whether the line is connected or not, whether there is a short circuit between two points
quality Meringue production line products There are several procedures in the production line
quality Meringue production line products There are several procedures in the production line
The quality Meringue production line products production line also contains a variety of fat-free acids, such as erucic acid, tungoleic acid, ricinoleic acid, etc. Due to the different characteristics of these three oils, lard is used in the production of Chinese pastries. The crisping effect is good, followed by butter.
Detail
The quality Meringue production line products production line also contains a variety of fat-free acids, such as erucic acid, tungoleic acid, ricinoleic acid, etc. Due to the different characteristics of these three oils, lard is used in the production of Chinese pastries. The crisping effect is good, followed by butter.
how china Meringue production line products are processed
how china Meringue production line products are processed
China Meringue production line products are also often used as a simple method to check components. In the test world, when the voltage measurement method can not be used to distinguish the cause of the defect is the short circuit of the resistor or the short circuit of the emitter base of the transistor, it can be Solder one end of the resistor from the circuit board, and then measure the resistance of the resistor.
Detail
China Meringue production line products are also often used as a simple method to check components. In the test world, when the voltage measurement method can not be used to distinguish the cause of the defect is the short circuit of the resistor or the short circuit of the emitter base of the transistor, it can be Solder one end of the resistor from the circuit board, and then measure the resistance of the resistor.

Foshan Aeros Industrial EquipmentCo.,Ltd(Sales Office)



Address: No.6,mingXi Road,Ming Chen Town,GaomingDistrict,Foshan,Guangdong Provice,PRC.
Tel: +86-757-88933066 / 88933068 +86-18123521651
Fax: +86-757-88933063
E-mail: aeroschina02@126.com

Factory Foshan Aeros Industrial EquipmentCo.,Ltd (Factory)
 

Address: No.6 Mingxi Road,Mingcheng Town,
Gaoming District, Foshan City, Guangdong Province, China
Tel: +86-757-88933066
Fax: +86-757-88933063

HK Offce:Aeros(international)Co.,Ltd



Address: Rm 5,16/F.,Kwong Kin Trade Centre,
5 Kin Fat Street,Tuen Mum,N,T.,Hong Kong
Tel: +852 2499 1823
Fax: +852 2499 1822
E-mail: aeroschina@gmail.com aeroschina05@126.com

Message to us

留言应用名称:
底部留言
描述:
验证码
QRcode

Copyright ©  Guangdong,China, Foshan Aeros Industrial Equipment Co., Ltd. All Rights Reserved.
粤ICP备18025868号 www.300.cn